About this Project

Advanced Geotechnical Solutions (AGS) provides TDS Construction with on-site construction observation based on recommendations made by AGS within a geotechnical engineering report to the project owner, Southwestern Production Corporation.  Deep foundations for new infrastructure such as pipe racks and compressors are being constructed. During the construction of both the infrastructure, AGS is providing on-site monitoring to ensure the design specifications are met. Monitoring consists of pier drilling observation, rebar observation, concrete testing, and nuclear gauge density testing.