Glenrock Housing & Senior Center
Projected Completion: January 2018
Client: Hal H. Hutchinson, P.E.
Type: Geotechnical Drilling, Geotechnical Lab Work, Geotechnical Report
Location: Glenrock, WY
About this Project
Advanced Geotechnical Solutions (AGS) was hired by Hal H. Hutchinson, P.E., to develop a geotechnical report based on geotechnical drilling and lab work. AGS provided geotechnical recommendations to repair a failed, paved area to the project site and recommendations for future use of retaining wall replacements. Option to perform geotechnical analyses to separate aspects of the site saved the owner approximately 25% of the fees should the phases have been completed separately.
Related Projects
Service Title
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam
Service Title
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam
Service Title
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam
Contact Us
Call: 307-439-5439
Address: 3440 Bypass Blvd., Casper, WY 82601