South Windriver Drive
Overview
In April 2020, Advanced Geotechnical Solutions (AGS) was hired by CEPI to work on a new section of Windriver Drive in Douglas, Wyoming. Primary services included subsurface exploration, laboratory testing, and construction materials testing (CMT). CMT activities included density testing on pipe backfill, subgrade soils, aggregate base, and asphalt. We also did field testing of concrete and laboratory testing of soils and aggregates, as well as curing and testing of concrete.
This project consisted of a new water line, sanitary sewer, and storm sewer. The new street is anticipated to have a concrete curbwalk installed on each side and paved with asphalt. The pavement sections are yet to be determined.