Advanced Geotechnical Solutions (AGS) was hired by Neumark Commercial Builders to conduct CMT services including density testing of pipe backfill, subgrade soils, and aggregate base as well as concrete testing, laboratory testing geotechnical and structural observation. 

Cedar Springs Transmission, LLC is constructing a wind energy facility to produce up to 400 megawatts of energy. The primary project components include up to 160 turbines, transformers, electrical collector lines, turbine access roads, meteorological towers, up to two operations and maintenance buildings, two substations, a 25-mile 230-kilovolt generation-tie transmission line from the project substation to the Windstar Substation near Glenrock, among other components necessary for completion and commercial operation of the project.

Cedars Spring Construction
Wind Facility Pad